After the drafting of various figures, extensive measurements were taken. Then, the raw materials were cut down to size.


Next, the primary holes were started at the drill press. Later, they were counter sunk and threaded.


After setting the speeds, the shaping and surfacing of the material was completed.


Finally, the cylindrical work was completed along with smoothing of the surface. Excellent then!


Weiya also joins me in the Shop. Another character whose advise I sought, was the esteemed Paul Hoffman.
Mike comments on the craftsmanship of the "one hit wonder". Right on!